INSTALLATION
Step #1: Lay a 2-8 inch sub-base of drainage material, such as
crushed rock.
Step #2: Lay EquiTerr panels on sub-base.
Step #3: Fill panel cells with additional drainage material.
Step #4: Add desired bedding and you're done!!
1. Surface material 10-15 cm sand mixture
2. EquiTERR filled with lava 0-4mm or stone
chippings 2-5mm
3. EquiTERR plates
4. Bedding area of gravel 2-5mm size and 4cm
depth
5. Permeable sub-base of stone aggregate of
15-20cmm varied depth according to ground conditions
6. Compacted ground 1% slope |